In recent years, with the continuous development of urban construction, many urban buildings will use the glass curtain wall construction methods, glass curtain wall good construction effect has also been recognized by the general public. Here to tell you about semi-hidden frame glass curtain wall installation method, interested friends to see it!
Glass curtain wall installation of the vertical cross-hidden glass curtain wall
The first installation method: the glass paste in the two sides of the edge of the installation of the groove on the glass frame, the glass frame with a fixed fixed aluminum plate in the aluminum frame system on the vertical bar; and glass up and down the two horizontal fixed in the aluminum Alloy frame grid groove in the mosaic groove. Glass and glass frame of the vertical edge of the glue in the factory is specialized in processing workshop completed, the material surface cleaning is guaranteed, good bonding quality. Glass frame is fully cured in the structural glue, only to the scene to install, bonding quality is guaranteed.
The second method of installation: the coated glass first fixed in the top and bottom of the aluminum alloy profile in the trough, in the glass and vertical bar surface to form a plastic slot slot, and then in the field will be filled with structural glue slot slot, the formation of Vertical structure of plastic glass assembly system. This method of production is due to the injection of materials in the field, the surface of the material clean and dry, when the plastic clean the environment are difficult to be fully guaranteed, and often before the structural adhesive is not cured to bear the wind load, affecting the bonding strength. Generally limited to buildings and aluminum alloy frame system without the installation of the gap between the buildings, unless the last resort, should not be used.

Glass curtain wall is installed in the horizontal and vertical non-hidden glass curtain wall
This system uses a structured glass assembly method, while the vertical use of aluminum alloy glass mosaic tank fixed. The practice is to glue the glass in the upper and lower sides with the installation of the groove on the glass frame, the glass frame on the frame in the aluminum frame system on the beam, the lower frame with a fixed piece fixed on the beam, and the vertical Fixed on the lower beam by means of a pressure plate, and the vertical edge is fixed in the glass lattice of the vertical bar by means of a pressure plate, and the whole piece of glass is formed from the top to the bottom of the glass by the vertical bar. Horizontal vertical and horizontal can not be on-site injection of plastic, do not allow the scene injection.
Semi-hidden frame glass curtain wall of another installation method, that is, in the full hiding glass curtain wall of the horizontal or vertical with a pressure plate, the formation of horizontal or vertical edge of the semi-hidden curtain wall. In other words, the whole hidden frame glass curtain wall made semi-hidden box effect. This plate is not only horizontal or vertical decorative lines, but also for the second glass fixed, security has been enhanced, but also can change the shape and color of the pressure plate to increase the pattern color.
The above is that we introduce you to the semi-hidden frame glass curtain wall installation method, this glass curtain wall between the hidden frame glass curtain wall and the glass frame between the frame, both good visual effects, but also in terms of security is also better which performed. This requires the installation of glass curtain wall in strict accordance with the installation standards to operate. With the emergence of glass curtain wall LED display, the glass curtain wall of this new advertising carrier's commercial value has been developed, its high permeability, green energy-saving performance by the majority of advertising companies and lighting companies love their future Development potential is limitless.
